DSCN1372.jpg
Aug. 9: The lobby. The auditorium is off to the left. The right-hand opening in the back wall is for the new lift, and the left-hand opening is for the new restroom.
|
|
IMG_0113.jpg
Aug 16: They've put the roof on the new addition, and they've started the interior framing.
|
IMG_0112.jpg
Aug 16: The north wall of the lobby. The auditorium door is on the far left. The left-hand opening is for the new restroom; the right-hand opening is for the lift. The restroom subflooring is in place. The walls you can see through the opening are the old exterior walls.
|
IMG_0103.jpg
Aug 16: Another view of the lobby. You can see the fieldstone wall of the old building behind the framing 2x4s in the back wall of the restroom.
|
IMG_0105.jpg
Aug 16: The lobby, as seen from the new restroom. The lift shaft is behind the 2x4s on the left.
|