IMG_0117.jpg
Aug 24: The lower level of the lobby, as seen from the bottom of the lift shaft. For protection during construction, they've covered the carpet with plastic and put plywood over the mural.
|
IMG_0119.jpg
Aug 24: The lift lower landing, as seen from just in front of the closets in the lower level of the lobby. The stairs are to the right.
|
IMG_0125.jpg
Aug 30: Looking up from the bottom of the lift shaft. The opening on the right (with the caution tape) goes to the lobby. The opening on the left is the ground-level exterior entrance.
|
IMG_0127.jpg
Aug 30: The future home of the costume closet, under the new bathroom. The right-hand wall is the original foundation of the auditorium, and the hole opens onto the furnace room.
|
IMG_0124.jpg
Aug 30: The lobby. The open doorway in the center is the new bathroom. The cutout in the wall is for the relocated water fountain.
|
IMG_0147.jpg
Sep 21: The lobby again, now with framing studs. The opening in the center is for the bathroom. Look closely and you can see the old fieldstone wall behind the studs, and the drain opening in the floor for the toilet.
|