IMG_0253.jpg
Mar 20: The other side of the finished lobby (auditorium is to the right, front doors are to the left). Note the new location for the ticket desk.
|
IMG_0242.jpg
Mar 20: They're finishing up outside. The outside lift door is in the center. They've installed red brick trim in the new outside corner. Next step: redo the stucko.
|