IMG_0140.jpg
Sep 21: The other side of the lobby; the auditorium is to the right. The brown paper protects the mural. The old water fountain has been removed.
|
IMG_0148.jpg
Feb 22: The new bathroom is almost complete! The plumbing is done, the walls and floor are in place, and it's even been painted.
|
IMG_0149.jpg
Feb 22: The almost complete bathroom, looking into the lobby.
|
IMG_0151.jpg
Feb 22: The lower level landing for the lift -- with doors, walls, and paint. The lift is behind the door with the narrow vertical window. The costume closet is behind the door to the left. The lounge is to the far left.
|
|
IMG_0247.jpg
Mar 20: The finished lobby. The auditorium doors are on the far left. On the back wall, the left-hand door is for the new bathroom, and the other door is for the lift. Note the relocated water fountain.
|